Six systems, six contractors, six points of contact
It is not clear which system a fault is coming from; each contractor points at the other.
Siemens Authorised Maintenance and Service · Trimbox Authorised Distributor for Turkey
All six systems under a single contract. When something fails, there is one number to call.
The same system is not the same job in a factory, a hospital and a marina. Pick your facility type and we'll send you the scope of work we do for that type, along with a tailored quote.
Factory and production facility
Industrial zone and logistics centre
Hospital and university
Shopping centre, hotel and retail
Airport and terminal
Marina and port
Residential complex and housing developmentIt is not clear which system a fault is coming from; each contractor points at the other.
Access control does not release doors in a fire scenario, and cameras are not linked to the event.
Every new requirement means a new conduit, a new hole, a new cost.
We handle design, procurement, installation and commissioning; turnkey if you want it.

All six are with us — the scope list above sets them out item by item. One contract, one site manager, one acceptance test.
We also write down what falls outside scope — items such as civil works, conduit chasing and painting usually sit with the site's own contractor. Rather than hiding these behind "not included" in the quote, we list them as a separate line.
We survey first. Cabling category and run lengths, the location and spare capacity of existing panels, the brand and firmware version of the panel/recorder in use, the power and cooling condition of the system room. Whatever is usable stays.
The typical outcome is a mix: the backbone and conduit infrastructure is kept, endpoints and central devices are renewed. A from-zero build is recommended only when the existing infrastructure cannot carry what the target system needs, and the reasoning is written into the quote.
Floor area on its own is misleading — two facilities of the same size can come out many times apart depending on point density. In order:
Brand choice is usually secondary next to these five items.
Most of the installation is done while the facility is running. The steps that require a shutdown are known and few: panel connections, the cutover moment from the old system to the new one, and acceptance tests. We schedule these between shifts, on a weekend, or during a planned stoppage.
We provide, in writing, before work starts, which step requires how much downtime — the schedule comes as an appendix to the quote. The total commissioning time varies with the size of the project.
This is where integration is actually tested. The typical scenario: when a fire alarm triggers, the access control doors on the escape route release, the announcement system delivers the evacuation message to the relevant zone, and the cameras flag the event and tag the recording.
For this to work, three things are needed: the systems speaking a common protocol, the scenario written down on paper in advance, and each step tested individually at acceptance. And a shared time reference — for logs to be correlated, all the systems need to see the same clock, which is exactly why master clock is on this list.
Does your scope go beyond these six systems? Write to us, we will reply within 24 hours.
Send us your questionWe reply with a written quote.We are an Official Siemens Dealer, and for Siemens fire detection, gas detection, emergency announcement, gas suppression, access control and security systems we are also an Authorised Maintenance and Service company. We are the Authorised Distributor for Turkey for Trimbox, and an Authorised Dealer for Rotarex, Gorgy Time and Adder.
The concrete side of that distributorship: we supply every group below on a project basis.
Specification, single-line diagram or room list — send whichever you have. We come back with a written quote broken down system by system, structured for a single contract.